|
|
|
Loudermilk Started in June 2000 as result of a visit to Length
=250Ft of track & sidings. Track is floating on about ˝ of layout and the
rest is supported by scratch built supports Bents composite decking material and
system from www.largescale.com ) A
waterfall was
constructed approximately 7 years ago. That was the start of my garden. It
consists of two ponds with a stream between them. The water is pumped from main
pond to waterfalls and then into pond one and that overflows to stream and then
to main pond. Mountain
stream has
running water supplied by a sump pump concealed under the deck and a sump pump
returns the water to the mountain & discharged into the stream. Mountains
are scaled versions of the System is DCC (Lenz Digital Command Control). The system is controlled by a command station or by remote utilizing a hand held cordless phone .The track is divided into 5 blocks and they are control by DCC-BitSwitches of Denver Colorado. This allows the trains (up to 4) to be controlled automatically using a principal of Latching relays. Bridges
include a Thru Trust Bridge, Howe Truss Bridge Deck Truss Bridge & Trestle
Bents they are scratched built form plans by: Brewer Plans
PO Box 48 Storage shed (10x 9) Patterned after train station on layout) for the Trains & was constructed in fall of 2003 and finished in 2004 Signal
system is
scratched built using brass tubes and square stock. The lights are controlled by
custom-built electronics. Phase
two will be
an addition of approximately 200-ft of track. Plans include a scratched built Many
of my ideas came form the |